The corridor is expected to start from Virar, a city in the Mumbai Metropolitan Region, known for its industrial and residential areas.
The proposed Virar-Alibaug Multimodal Corridor will span approximately 70 kilometers, connecting Virar in the north to Alibaug in the south. The corridor will pass through the following key locations:
Approx. 96.4 km to 98.5 km stretch (primary construction phase). Phase 2 (Balavali to Alibaug): Remaining 29.9 km stretch. 💡 Key Technical Features 8 to 14-lane access-controlled expressway. Multimodal Nature: Includes a dedicated center path for Metro Line 14. Design Speed: Right of Way (RoW): 99 meters wide, accommodating service roads and utilities. MagicBricks ⏱️ Timeline & Status (2026 Updates)
Space reserved for water mains, gas pipelines, and fiber optic cables. Crescera Group Visualizing the Corridor
Q: What are the proposed benefits of the VAMC? A: The VAMC is expected to enhance connectivity, reduce congestion, promote economic growth, and contribute to environmental sustainability.